• Home
  • About Us
    • Company History Internet Sales Chart of Kosun Quality Certification About KOSUN
  • Products
    • Solids Control Equipment Solids Control System Product Parts Safety Equipment Drilling Waste Management Camp
  • Services
    • OEM Manufacturing Equipment Maintenance Equipment Leasing
  • Cases
  • News
    • Group News Industry News Media Reports
  • Contact Us
首页 > News > Industry News

The No. 6 Gas Production Plant, Changqing Oilfield Company makes a drilling footage over 100,000m


 On April 1, the drilling footage of the New Year's production capacity of the No. 6 Gas Production Plant, Changqing Oilfield Company exceeded 100,000 meters, and the time to reach this length was 28 days earlier than the year of 2018.

 
In order to ensure the quality and efficiency of production and construction, as well as high-quality and rapid development, the No. 6 Gas Production Plant has continuously deepened geological research and promoted technological innovation. On March 6, the first analysis while drilling and deployment disclosure meeting this year preliminarily defined the overall plan for the annual production and construction deployment, and carried out the geological analysis while drilling according to the implementation effect, and timely optimized and adjusted the deployment. Up to now, a total of 27 additional coordinates have been deployed, 11 production and construction favorable zones have been implemented, and 339 effective coordinates have been prepared.



 

At the same time, relying on the special projects and key technologies of Changqing Oilfield Company, the “twice-drilling” technology and the “small borehole” test were actively promoted. On March 8, the gas well with twice-drilling technology in the Gaoqiao area was successfully drilled. The second section to the finished drilling only took 11.21 days, which was 30% higher than the drilling speed of a conventional well with the same depth.

Any question or support, please fill in the form below,we will get back to you as soon as possible!!

  • The last: 
  • CNOOC's oil and gas reserves have hit a new record high, and CNOOC people are amazing!
  • The next: 
  • Analysis of Resource Utilization of Sludge

Industry News

  • Group News
  • Industry News
  • Media Reports

PRODUCTS

Solids Control Equipment

  • Submersible Slurry pump
  • Mud Gun
  • Mud Agitator
  • KOSUN BEM shaker
  • Drilling Fluid Shale Shaker
  • Desilter
  • Centrifugal Pump
  • Jet Mud Mixer
  • Vacuum Degasser
  • Shear Pump
  • Mud Cleaner
  • Decanter Centrifuge
  • Desander
  • Water Tank
  • Diesel Tank
  • Mud Tank

Solids Control System

  • Arctic Solids Control System
  • Mobile Solids Control System
  • Skid-mounted Solids Control System

Drilling Waste Management

  • Hi-G Dryer
  • Screw Pump
  • Screw Conveyer
  • Vertical Centrifuge

Safety Equipment

  • Ignition Device
  • Mud/Gas Separator

Drilling Rig

  • Cone
  • Shaker Spring
  • Screen
  • Electric Control System

Camp Room And Tank

  • Camp

Contact Us

KOSUN MACHINERY CO., LTD.
Phone: +86 13379250593
           (WhatsApp/WeChat)
E-mail: office@adkosun.com
Add: D22, 4th Floor, Deyue Smart Valley, Fengcheng 10th Road, Xi 'an Economic & Technological Development Zone, Shaanxi Province, China

Index       Products       Services      About Us       Cases       News       Contact Us      Sitemap


Copyright 1992-2023 by KOSUN Group All rights reserved