• Home
  • About Us
    • Company History Internet Sales Chart of Kosun Quality Certification About KOSUN
  • Products
    • Solids Control Equipment Solids Control System Product Parts Safety Equipment Drilling Waste Management Camp
  • Services
    • OEM Manufacturing Equipment Maintenance Equipment Leasing
  • Cases
  • News
    • Group News Industry News Media Reports
  • Contact Us
首页 > News > Industry News

KOSUN's CNOOC offshore drilling artificial island first set of fixed control system successfully pu


Recently, a complete set of solid control system produced by KOSUN has arrived at the CNOOC offshore drilling artificial island project site and put into use. This set of fixed control system is applied to offshore drilling platform. KOSUN strictly control the production quality, to ensure that products meet quality standards, process can completely satisfy the level 5 of drilling fluid solids control (screening - degassing - except sand silt - centrifugal), shipment of the equipment at the same time, KOSUN's solid control system technical service team to the scene, to be responsible for guiding system box installation debugging, and the construction of personnel training for equipment operation and maintenance.


The oil solid control system is mainly used to control and separate the solids of the oil drilling fluid. It allows the drilling fluid to be recycled.
 


The oil solid control system is mainly for the solid control and separation of oil drilling fluid, which is suitable for the drilling process of 2000-7000 meter oil Wells. The oil solid control system is composed of 3-7 modular combination tanks. The whole circulation system can be separated and connected between tanks and warehouses to meet the needs of drilling operations. The bottom valve of suction manifold is flexible to open and reliable to seal after closing. The whole circulation system is equipped with grade 5 purification equipment, supporting equipment vibration scren, sand and mud removal cleaner, vacuum deaerator and agitator, etc. The use of the new oil drilling mud purification system reduces mud discharge and has obvious environmental protection effect.

Any question or support, please fill in the form below,we will get back to you as soon as possible!!

  • The last: 
  • KOSUN ZJ50 solid control system was sent to shaanxi coal shale gas exploration and development site
  • The next: 
  • KOSUN SP series solids control system shear pump

Industry News

  • Group News
  • Industry News
  • Media Reports

PRODUCTS

Solids Control Equipment

  • Submersible Slurry pump
  • Mud Gun
  • Mud Agitator
  • KOSUN BEM shaker
  • Drilling Fluid Shale Shaker
  • Desilter
  • Centrifugal Pump
  • Jet Mud Mixer
  • Vacuum Degasser
  • Shear Pump
  • Mud Cleaner
  • Decanter Centrifuge
  • Desander
  • Water Tank
  • Diesel Tank
  • Mud Tank

Solids Control System

  • Arctic Solids Control System
  • Mobile Solids Control System
  • Skid-mounted Solids Control System

Drilling Waste Management

  • Hi-G Dryer
  • Screw Pump
  • Screw Conveyer
  • Vertical Centrifuge

Safety Equipment

  • Ignition Device
  • Mud/Gas Separator

Drilling Rig

  • Cone
  • Shaker Spring
  • Screen
  • Electric Control System

Camp Room And Tank

  • Camp

Contact Us

KOSUN MACHINERY CO., LTD.
Phone: +86 13379250593
           (WhatsApp/WeChat)
E-mail: office@adkosun.com
Add: D22, 4th Floor, Deyue Smart Valley, Fengcheng 10th Road, Xi 'an Economic & Technological Development Zone, Shaanxi Province, China

Index       Products       Services      About Us       Cases       News       Contact Us      Sitemap


Copyright 1992-2023 by KOSUN Group All rights reserved